top of page
March: Equipment Safety

Objective: Safe operation and maintenance of concrete lifting equipment.

Discussion Points:

- Perform pre-use inspections on pumps, hoses, and other machinery. Replace or repair any defective components immediately.

  • Hoses and Fittings:

    • Check all hoses for cracks, kinks, or leaks.

    • Ensure fittings are secure and properly sealed.

  • Pumps and Valves:

    • Test pumps for smooth operation and inspect valves for proper opening and closing.

  • Mixing Gun:

    • Clean the mixing gun thoroughly to remove any cured material.

    • Confirm that spray nozzles are clear and unobstructed.

  • Filters:

    • Replace or clean filters to ensure proper flow of materials

- During Use:

  • Mixing and Application:

    • Ensure the mixing gun is aligned correctly for thorough blending of components.

    • Apply foam in layers, allowing each layer to expand before adding more.

  • Monitor Equipment:

    • Watch for pressure fluctuations or clogs and address them immediately.

  • Temperature Management:

    • Keep materials and equipment within the recommended temperature range to avoid improper curing or poor adhesion.

- Respond to equipment malfunctions by safely shutting down the machine and reporting the issue.

Activity: Walk the team through a hands-on inspection of a pump and hoses.

STIRLING BUSINESS TOOLS

©2024 by Stirling Industries. Proudly created with Wix.com

bottom of page